Chart versioning means storing the history of chart configuration changes through versions. A list of versions is available to users with the lowest level of Read access to the chart.
Note
Currently, versioning is only supported for dataset-based charts.
To go to the list of versions, click the icon at the top of the screen and select Change history.
To select a version from the list, click it. The version number will be displayed in the revId parameter in the chart address string. Clicking a link with the version number in the revId parameter will open the relevant version of the chart.
When editing within the current version, you can undo/redo any change you have made. To do this, in the top-right part of the screen, click:
Current: This is the most recently saved version of a chart. All users can see it on dashboards, as well as when directly navigating to charts or opening them for editing from the dashboard context menu. Only one version of a chart can be current.
If a user has Write permissions, they can make any chart version current.
Warning
When updating any version, except a draft, a new chart version is created.
Draft: This is a version with unsaved chart changes. Common users do not see changes being made to a draft. This enables you to hide chart edits until you release a new version. A chart can only have one draft.
To create a draft after editing a chart, click the down arrow in the top-right corner and select Save as draft.
You can display a draft version of your chart on the dashboard. To do this, add the unreleased parameter set to 1 to the widget parameters on the dashboard for this chart.
Outdated: This is a version that is neither current nor a draft.
Tip
You can share any chart version by adding the revId parameter to the chart link, e.g., ?revId=zac5m4edoaqqr.
In the current chart version edit mode, after you click Save (which creates a new current version) or → Save as draft (which creates a new draft version).
In the draft edit mode or non-current chart version edit mode, after you click Save as draft (which creates a new draft version) or → Save and make current (which creates a new current version).
In draft or non-current chart version view mode, after you click Make current.
You will also get a new version if you change chart configuration as follows:
Edit the chart settings you can access by clicking at the top of the screen.